SunilKulkarni~ 2006 blog postsBidar-Gulbarga Line Updates.
Pic 1) New Railway Bridge on NH218 near Kamalapur
Pic 2) New Railway Bridge on NH218 near Kamalapur
Pic 3) Tunnel towards Margutti End
Pic 4) Tunnel towards Kamalapur end
Pic...
more...
Pic 1) New Railway Bridge on NH218 near Kamalapur
Pic 2) New Railway Bridge on NH218 near Kamalapur
Pic 3) Tunnel towards Margutti End
Pic 4) Tunnel towards Kamalapur end
Pic...
more...
3 Posts
total length of tunnel is 1.8 Kms of which arround 900 meters is done... and currently work has been started from both ends of the tunnel by two different contractors and its going at brisk speed... hope in next 6 months they will complete the tunnel digging works and remaining few months will require for other works inside tunnel...
which is the hill? I mean name of hill through the tunnel passes?
There are many hills enroute between Gulbarga and Bidar they start just after Kamalapur(in Gulbarga District) and stretches over till Humnabad/Bidar... I believe Bidar is on higher altitude than Gulbarga.. This particular Hill is at Margutti village in Gulbarga district... (no name as such)