Search Forum
Blog Entry# 1656767
Posted: Nov 21 2015 (14:09)
No Responses Yet
No Responses Yet
I have 3 questions :-
1.) What is the current status of Tarakeshwar Magra proposed railway line?
2.) Does any train ply through the Magra Tribeni Single line Diesel BG route?
3.) Can any body tell me if the Tarakeshwar Bargachia extension has been planned at all or not?
1.) What is the current status of Tarakeshwar Magra proposed railway line?
2.) Does any train ply through the Magra Tribeni Single line Diesel BG route?
3.) Can any body tell me if the Tarakeshwar Bargachia extension has been planned at all or not?