Search Forum
Blog Entry# 1756698
Posted: Mar 03 2016 (21:10)
22 Responses
Last Response: Apr 02 2016 (19:22)
22 Responses
Last Response: Apr 02 2016 (19:22)
#railwayengineering
*************** Procedure of Lifting of Axle of Three Phase Electric Locomotives(WAP-7 & WAG-9) in E-Loco Website *******
Pictorial (Movies) - courtesy of ELS/LGD/SCR
For Movies Please Refer this Link:...
more...
*************** Procedure of Lifting of Axle of Three Phase Electric Locomotives(WAP-7 & WAG-9) in E-Loco Website *******
Pictorial (Movies) - courtesy of ELS/LGD/SCR
For Movies Please Refer this Link:...
more...
1 Public Posts - Thu Mar 03, 2016
11 Public Posts - Fri Mar 25, 2016
9 Public Posts - Sat Apr 02, 2016
Even with SCR, the reason for rejecting was more about convenience. LGD already has a sizeable fleet of WAG9 locos. And, other than the gear ratio and software changes, WAP7 is nothing but a white WAG9 :P . So, adding WAP7's would not cost them anything as there is no infrastructure change needed. Whereas adding WAP5's needs quite a lot of infrastructure changes. I hope sheds which are still not in the 3 phaser list, like BZA and AJJ get to home WAP5's.