Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Did you know that the Ganga & Kaveri rivers are connected? ... by Mysore Varanasi Express - Vishwanath Joshi

Search Forum
<<prev entry    next entry>>
Blog Entry# 1756698
Posted: Mar 03 2016 (21:10)

22 Responses
Last Response: Apr 02 2016 (19:22)
2 Followers
Info Update
56062 views
13

★★
Mar 03 2016 (21:10)   NDLS/New Delhi (16 PFs) | RPM/WAP-7/30421
 
guest   6387 blog posts
Entry# 1756698            Tags   Past Edits
#railwayengineering
*************** Procedure of Lifting of Axle of Three Phase Electric Locomotives(WAP-7 & WAG-9) in E-Loco Website *******
Pictorial (Movies) - courtesy of ELS/LGD/SCR
For Movies Please Refer this Link:
...
more...
click here
(Screenshot Attached with this BLOG)
For the PDF Document regarding Lifting Instruction by RDSO please refer this Link:click here
(PDF Document Attached with this BLOG)
Attached Screenshots:
Lifting Link of 3-Phase Loco in E-Loco Website
Pictorial Movies Link
Attached PDF Document:
Wheel Lifting Instruction of 3-Phase Loco Published by RDSO (18 Page PDF Document)
Attached Image:
WAP7-RPM-30421 --- Up close & personal with this 3-phase beauty by Sam at Coimbatore on 18th Oct 2015, while this speedstar was taking a nap on the loop line under mid-day sun
Link: click here
Courtesy: Sam

Translate to English
Translate to Hindi

1 Public Posts - Thu Mar 03, 2016

11 Public Posts - Fri Mar 25, 2016

9 Public Posts - Sat Apr 02, 2016

5590 views
3

Apr 02 2016 (19:22)
TheMadrasMail~
TheMadrasMail~   6349 blog posts
Re# 1756698-26              
Even with SCR, the reason for rejecting was more about convenience. LGD already has a sizeable fleet of WAG9 locos. And, other than the gear ratio and software changes, WAP7 is nothing but a white WAG9 :P . So, adding WAP7's would not cost them anything as there is no infrastructure change needed. Whereas adding WAP5's needs quite a lot of infrastructure changes. I hope sheds which are still not in the 3 phaser list, like BZA and AJJ get to home WAP5's.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy