Please change the number of platforms from 5 to 3..dn't mislead people.
4 Posts
COnstruction of PFs is like a much needed one..
strictly speaking - in my so many long years of experience, I was never in a train coming from BZA side through the Arc Bridge without stopping between Godavari and Main stations due to non availablity of clearance. It is like a bubble gum stop.
Each and every train i hv travelled through stopped between godavari and rjy stations liek an average of abt 3-5 mins minimum and tehn slowly crawls into the main station adding a delay of like 10...
more...
strictly speaking - in my so many long years of experience, I was never in a train coming from BZA side through the Arc Bridge without stopping between Godavari and Main stations due to non availablity of clearance. It is like a bubble gum stop.
Each and every train i hv travelled through stopped between godavari and rjy stations liek an average of abt 3-5 mins minimum and tehn slowly crawls into the main station adding a delay of like 10...
more...
Its pity that every one speaks abt slack.....MPS....LHb coaches....Double engines...surveys...new lines....
But Budget did not give any proposal of new terminals
But Budget did not give any proposal of new terminals
But at the same time i really cant undrstand the exact reason behind stoppage between godavari and rjy.. is it truely due to pf occupancy ?? tehn y its not found in any other station enroute, giving that the entore stretch is Double line. Passengers towards NDD - TNK - BVRM will anyways occupy pf 2 always. and pf 1 being DOWN main line and PF 3 being UP main line
I am not sure abt the groud stats
But even now IR has no serous plan to reduce slack and outer waiting time.
For them late of 20 mins or 30Mins is negligable,they say we are very concerned abt delays...but they are not implemented practically
But even now IR has no serous plan to reduce slack and outer waiting time.
For them late of 20 mins or 30Mins is negligable,they say we are very concerned abt delays...but they are not implemented practically