AdityaImmortal^~ 310 news posts
जागरण संवाददाता, गोरखपुर : विदेशी कंपनी ‘टाल्गो’ की अति आधुनिक 1 सेमी हाईस्पीड वाली बोगी गोरखपुर भी पहुंच गई है। यांत्रिक कारखाना में उसके पार्ट्स जोड़े...
87 Posts
Abhi WAP-8 ke Introduce hone me time hai.....
Jab tak New Loco work shop nahi banta tab tak production of P-8 not possible
Jab tak New Loco work shop nahi banta tab tak production of P-8 not possible
WAP7D is scrapped :P. WAP8 is not confirmed, however, WAG10 is confirmed (Y).
To trail run bhi wap8 ke banne ke baad lena chahiye tha abhi lene se kya fayda
Info source : click here
Alstom has received a Letter of Award[1] from the Ministry of Railways to supply Indian Railways with 800 double section freight electric locomotives with associated long-term maintenance[2]. The total contract is worth above €3 billion. This project includes the set-up of a plant at Madhepura (Bihar state) and two maintenance depots at Saharanpur (Uttar Pradesh state) and Nagpur (Maharashtra state). The delivery of the locomotives will spread between 2018 and 2028.
This project, one of the strongest endorsements of the ‘Make in India’ policy of the government, will...
more...
Alstom has received a Letter of Award[1] from the Ministry of Railways to supply Indian Railways with 800 double section freight electric locomotives with associated long-term maintenance[2]. The total contract is worth above €3 billion. This project includes the set-up of a plant at Madhepura (Bihar state) and two maintenance depots at Saharanpur (Uttar Pradesh state) and Nagpur (Maharashtra state). The delivery of the locomotives will spread between 2018 and 2028.
This project, one of the strongest endorsements of the ‘Make in India’ policy of the government, will...