Search Forum
Blog Entry# 1833966
Posted: May 05 2016 (20:23)
3 Responses
Last Response: May 07 2016 (09:48)
3 Responses
Last Response: May 07 2016 (09:48)
when doubling will get completed in Wadi - Daund section. after complete end to end doubling, whether travel time of shatabdi decrease by 60 minutes.
present avg speed s 70Avg speed,to speed up 1 hour its avg speed has to become 83Avg speed.
speeding up 1 hour may not be possible practically even the section is completly FEDL after a decade.
And out of 597kms in between SC-WADI is running at avg speed of 72Kmph for 185kms with 4 halts and in between DD-PUNE for 70Kms it is running with avg speed of 70Kmph which is FEDL
and...
more...
speeding up 1 hour may not be possible practically even the section is completly FEDL after a decade.
And out of 597kms in between SC-WADI is running at avg speed of 72Kmph for 185kms with 4 halts and in between DD-PUNE for 70Kms it is running with avg speed of 70Kmph which is FEDL
and...
more...
what about current MPS in different sections between Pune & SC ? 130 MPS not possible after doubling?
Current mps 120, there is long way ahead to speak abt feld of gr daund, it gonna take some more years.
Speedup is possible, but not 60mins, scr within it limits from wadi to sc it speeds up 10 to 15mins, I have no idea how much cr react on it.
Speedup is possible, but not 60mins, scr within it limits from wadi to sc it speeds up 10 to 15mins, I have no idea how much cr react on it.