Search Forum
Blog Entry# 1850178
Posted: May 16 2016 (20:45)
6 Responses
Last Response: May 16 2016 (22:53)
6 Responses
Last Response: May 16 2016 (22:53)
***********************14/05/2016 3-Ph Failure Reports:****************************************** **************
(1) GZB WAP-7 Loco 30222 = (Train delayed 12424)
.
(NDLS-GHY/Load-21 coaches), While approaching Patna city (PNC) Station, PT lowered automatically and DDS blank and stopped at PNC station. LP raised the panto then ok and worked. Same trouble was occurred previously between Ara-Kulharia...
more...
(1) GZB WAP-7 Loco 30222 = (Train delayed 12424)
.
(NDLS-GHY/Load-21 coaches), While approaching Patna city (PNC) Station, PT lowered automatically and DDS blank and stopped at PNC station. LP raised the panto then ok and worked. Same trouble was occurred previously between Ara-Kulharia...
more...
1 Public Posts - Mon May 16, 2016
4 Public Posts - Mon May 16, 2016