== #PEDDAPALLI- #NIZAMABAD #LINE UPDATE==
I thought that the track laying was fully completed but its not, last week I was going towards Armoor by bus, the rail over bridge near Ankapur Village that passes over NH 16 is still under construction(half done). The railway track on either side of the road is laid except that they have to connect it over the bridge once its done. And the railway stations at Ankapur and may be some other places are to be constructed. I think it may take more 4 to 6 months for sure to make this line fully completed.
I thought that the track laying was fully completed but its not, last week I was going towards Armoor by bus, the rail over bridge near Ankapur Village that passes over NH 16 is still under construction(half done). The railway track on either side of the road is laid except that they have to connect it over the bridge once its done. And the railway stations at Ankapur and may be some other places are to be constructed. I think it may take more 4 to 6 months for sure to make this line fully completed.
2 Public Posts - Thu May 19, 2016
1 Public Posts - Fri May 20, 2016
1 Public Posts - Sat May 21, 2016
1. I didn't see any major upgradation or arrangement yet, except the installation of two lifts on the right sided FoB and water booths on all the platforms.
2. Its a rumor that there may be construction of 1 or 2 more platforms ( or may be tracks) which may be easily accessible from the rear entrance. However this is uncertain as there is no official news.
3. According to the recent news multi-functional food courts may come up at PF 1 (the complexes are already constructed but not functional yet).
4....
more...
2. Its a rumor that there may be construction of 1 or 2 more platforms ( or may be tracks) which may be easily accessible from the rear entrance. However this is uncertain as there is no official news.
3. According to the recent news multi-functional food courts may come up at PF 1 (the complexes are already constructed but not functional yet).
4....
more...