Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

For RailFans, seeing RAC-1/2/3 in Mumbai-UP Trains is more exciting than Election Results - rdb

Search Forum
<<prev entry    next entry>>
Blog Entry# 1877142
Posted: Jun 02 2016 (20:29)

7 Responses
Last Response: Jun 03 2016 (13:00)
General Travel
38346 views
12

★★
Jun 02 2016 (20:29)  
 
guest
Entry# 1877142               Past Edits
Q. Ever wondered , why DIESEL LOCOMOTIVES are left IDLE or not SHUTDOWN??
Link:click here
You all have observed many times that diesel locomotives are kept idle in the yards and also when waiting for too long in the yards or station especially for goods train. Loco pilots can switch off the diesel engine and save fuel instead of running in IDLE condition
But
...
more...
they don't do because
1. The brake pipe pressure reduces due to the leakages and it takes longer time to build up working pressure again.It is very curcial when waiting for the signal on the grade.
2. A proper checklist have to followed to recrank the engine. It takes 10-15 min to do so when starting after a long shutdown.
3. To keep the compressor running , engine must not be switched off as it is coupled with the engine.
4. As the diesel engine contains usually 16 cylinders and are also big in size , so it is quite difficult to achieve ignition temperature.There are many auxiliary components running so if one fails or some technical parameter changes may cause problem in starting.
A new technological improvement and upgradation is done in indian railways. A new fuel saving device called APU (AUXILIARY POWER UNIT) are being installed in the diesel locomotives.In future, Indian railways plan to fit APU on 100 per cent in newly-built diesel locomotives which will then result in saving of more than Rs 60 crore annually in future. Use of APU also results in lower CO2 emission and other pollutants like HC, NOx, CO etc."
Contd....

Translate to English
Translate to Hindi

27554 views
7

Jun 02 2016 (20:31)guest
Re# 1877142-1               Past Edits
@1877142-0  @guest
Continued Part 2
During idling a lot of fuel get wasted only to charge the batteries and to kept the air compressor running. By using APU, main engine shuts down and small 25hp engine starts, and charges batteries and air brake pipes, when the train is idle for more than 10 minutes. The diesel engine of APU consumes only three litres of diesel per hour in comparison to 25 litres by the main engine. Expected savings per locomotives fitted with APU is Rs 20 lakh per year on account of saving in fuel oil.
...
more...
APU is a self-contained unit containing a small diesel engine coupled to a compressor and alternator for battery charging. It has its own set of controls, accessories and is integrated to the existing microprocessor control system of locomotive.
1. APU is located in the nose compartment under dynamic brake grid resistors and after the air brake panel.
2. This is an Add on unit to Microprocessor based loco control system.
3. It is called as AESS with APU.
4. It starts automatically and stops automatically as per the drivers request.
#via: MEDHA INDIA

Translate to English
Translate to Hindi

2 Public Posts - Thu Jun 02, 2016

4 Public Posts - Fri Jun 03, 2016
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy