Search Forum
Blog Entry# 1935669
Posted: Jul 20 2016 (18:54)
5 Responses
Last Response: Jul 25 2016 (19:23)
5 Responses
Last Response: Jul 25 2016 (19:23)
Jul 20 2016 (18:54) 82505x/Pune - Kamakhya Suvidha Special | HN/Hathbandh (4 PFs) | TATA/WAG-7/28233
DJRF2012^~
DJRF2012^~ 21365 blog posts!!!RARE SIGHT!!!
.
Triplet WAG-7's doing the honors of 1.5 hrs late running 82505 PUNE-KYQ Suvidha Spl stunned by raging 12130 Azad Hind Exp smashing Hathbandh @Flat MPS. AJNI WAG-9 31074 also witnesses the show
.
Video...
more...
.
Triplet WAG-7's doing the honors of 1.5 hrs late running 82505 PUNE-KYQ Suvidha Spl stunned by raging 12130 Azad Hind Exp smashing Hathbandh @Flat MPS. AJNI WAG-9 31074 also witnesses the show
.
Video...
more...
By the pic posted, I see only one WAG7 is powered (leading loco), the rest are shut down. Am I correct or am I missing something? If so, might be a loco failure or any technical problem.
In such case (if only one loco is powered), we can't consider them as triplets. Only when all the three are powered, then only they are considered to be triplets.
In such case (if only one loco is powered), we can't consider them as triplets. Only when all the three are powered, then only they are considered to be triplets.
Yes ur correct... Most probably these locos would have been available and alloted this train to haul... Generally crew dont detach (Un-Mu) loco as unMuing and MUeing is a long and tiresome process... hence triplets but only one is powering the train... rest are shut down...
All the three might not be mued. Mued locos can be unmued only at the shed (few exceptions here also). As per my guess, the rest might be for the shed movement.