Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

The mighty veteran Purulia Express serving for decades, daily commuters' lifeline and witness to a Rising Bengal! - Soumyadip Mahato

Search Forum
<<prev entry    next entry>>
Blog Entry# 1982207
Posted: Sep 05 2016 (20:03)

3 Responses
Last Response: Sep 07 2016 (22:15)
General Travel
20235 views
9

Sep 05 2016 (20:03)   17222/Mumbai LTT - Kakinada Port Express (PT) | SUR/Solapur (5 PFs)
 
psanga_sur^~
psanga_sur^~   5601 blog posts
Entry# 1982207            Tags   Past Edits
#TripReport
Date of Journey - 01 Sep 2016
From - Pune Junction
To - Solapur Junction
Train No. - 17222 LTT (Kurla) Kakinada Express
Engine
...
more...
- WDG 3A Kalyan Shed
At 14:15 left office and took PMPML Bus No 115 Hinjewadi - Pune Station and reached Pune Station at 15:15. Display indicator was showing Kakinada has delayed by 30 minutes. Taken my journey ticket from ATVM Machine.
Entered to PF 1, huge of passengers are waiting for Pune Gorakhpur. Pune Indore departed from PF 1 after 10 mins Deccan left from PF 5. I went to PF 2, Koyana came to PF 4 at 15:30 and Udyan on PF 2 at 15:40. Udyan left at 15:55 sharp. As soon as Udyan reached Shivajinagar bridge Koyana departed (As this section is converted from block section to automatic signalling system).
My train arrived Pune at 17:20 on PF 2 and departed at 17:30 i.e. 1 hr delayed. WDG 4 UBL Shed (Ex KJM Shed) hauling Pune Gorakhpur departed at 17:20. Till Daund my train was trailing Gorakhpur Express hence stopped at Loni, Yavat and Patas as line was not clear.
After Patas, train entered into Solapur Division. Both driver as well as Controller goes mad from here (Awesome Controller). From Daund, each and every station WDG 3A is just honking and smoking madly and continuously running at speed of 110 Km/hr. Not a single crossing on this single line section, as other trains are already on loop line for giving side to this late running train.
I was expecting to reach Solapur around 20:30, but surprisingly train reached at 19:50 only. Within 3 hrs 20 mins only. As platform was not available, train was waited at outer for 10 mins and after Shatabdi departs 17222 came to PF 2 of Solapur at 20:00.
I sincerely thanked to driver and Controller of Solapur Division who made me feel of traveling in Shatabdi/Rajdhani type train... _/\_ :)

Translate to English
Translate to Hindi

7112 views
3

Sep 05 2016 (22:20)
Positivecharge~
Positivecharge~   8026 blog posts
Re# 1982207-1              
Bhau....ltt coa and ltt vskp has suparb run between pune and wadi
Translate to English
Translate to Hindi

6777 views
1

Sep 06 2016 (04:53)
psanga_sur^~
psanga_sur^~   5601 blog posts
Re# 1982207-2              
Controller plays important roll here in single line section..
Translate to English
Translate to Hindi

6723 views
2

Sep 07 2016 (22:15)
psanga_sur^~
psanga_sur^~   5601 blog posts
Re# 1982207-3              
In return journey, 19419 Chennai Ahmedabad Express reached Pune 1 hr before.. hence stopped at Ghorpadi for 35 mins and at outer for 20 mins..
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy