Search Forum
Blog Entry# 2012196
Posted: Oct 05 2016 (15:21)
No Responses Yet
No Responses Yet
Is the new time table a joke? Rake reversal takes place at Dangoaposi and the train 18416 has been given stoppage of 1 Minute at Dangoaposi. How can engine be detached, brought to the back of the train through another line and attached to the back in 1 Minute? The train 18415 has already stoppage of 30 minutes at Dangoaposi.