এক রাজ্য, দুই রাণী।নাম তাদের, শালিমার ও আলিপুরদুয়ার রাজ্যরানী - Dip

Search Forum
<<prev entry    next entry>>
Blog Entry# 2026953
Posted: Oct 17 2016 (16:26)

10 Responses
Last Response: Oct 30 2016 (22:32)
Rail Fanning
14088 views
7

Oct 17 2016 (16:26)   12876/Neelachal Express (PT) | LJN/Lucknow Junction NER (6 PFs) | MGS/WAP-4
 
Mayank Singh~
Mayank Singh~   2372 blog posts
Entry# 2026953            Tags   Past Edits
I took a trip in 12876 Neelachal on 16 Oct between Lucknow and Kharagpur. Train arrived LKO 40 min late. ASR HWH stood parallel to it. We left LKO before 13049 ASR HWH(that goes via SLN ). But PBH route is very congested and we were stopped at many places for crossings.Spotted xings were with Padmavat and Bundelkhand Exp. Reached BSB 2 hr 50 min late. Food was not delivered by IRCTC E Catering due to heavy delay. Maintained its delay till MGS where we xinged with DNR ANVT exp and Imperial mail. ASR HWH was scheduled to arrive after us.Coaches were new but too crowdy.Toilets were biotoilet equipped. AC 3 Tier easily had 100 people per coach. Loco link for NDLS to LKO was MGS P4. For LKO to MGS it was a WDP 4D. MGS to KGP was a red P 4 of unknown shed. Reached...
more...
KGP with a delay of 3 hrs.
>View after Tata crossing a river (Subarnarekha?)
>Condition of coach in the morning
>Freight visible after TATA
>View after TATA
>Rail track running parallel to us after TATA
>Lucknow Shatabdi standing at LJN
>Lucknow Barauni at LJN
>Lucknow Metro under construction
>Beautiful Lko

Translate to English
Translate to Hindi

5 Posts

8261 views
1

Oct 30 2016 (13:41)
Mayank Singh~   2372 blog posts
Re# 2026953-6              
Agreed. A daily train between lucknow and bbs is needed.
The LKO RBL route still has a very long way to go for electrification. Majority of this section is still single tracked.
Translate to English
Translate to Hindi

7988 views
0

Oct 30 2016 (17:43)
IndianTrainFanonTwitter~
IndianTrainFanonTwitter~   10340 blog posts
Re# 2026953-7              
Oh my.... what stretches have been doubled between Utretia Jn and Janghai Jn ? IR has started so many trains via RBL which they could have easily run via the double track electrified route of Jaunpur City - Sultanpur !!!!
Translate to English
Translate to Hindi

8090 views
1

Oct 30 2016 (22:05)
Mayank Singh~   2372 blog posts
Re# 2026953-8              
Literally nothing between UTR and Janghai. LKO-PBH is pretty barren single line. Bhadohi-BSB is double line. PBH-Bhadohi is a mix[single for the most part].
IR runs most trains here since it is politically important route. Raebareily and Amethi are congress mainstays.
Translate to English
Translate to Hindi

7995 views
1

Oct 30 2016 (22:31)
aansaari~   1392 blog posts
Re# 2026953-9               Past Edits
LKO-JNH is still single....doubling underway on JNH-BSB....
Translate to English
Translate to Hindi

7978 views
0

Oct 30 2016 (22:32)
aansaari~   1392 blog posts
Re# 2026953-10               Past Edits
currently hardly 1/4 of BSB-JNH stretch doubled....however soon the whole stretch would be doubled.....work going on
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy