NZB - PDPL LINE UPDATE
Level Crossing works at Mamidipalli.(don't know if this is a level crossing or an RUB). The last picture is the constructed ROB near Ankapur.
Level Crossing works at Mamidipalli.(don't know if this is a level crossing or an RUB). The last picture is the constructed ROB near Ankapur.
1 Posts
Good pics!
-
Work on at full swing. Guess they will try to complete by fiscal end Mar-2017, like you said.
-
The last pic is Nagpur-Hyderabad Highway right?
-
Work on at full swing. Guess they will try to complete by fiscal end Mar-2017, like you said.
-
The last pic is Nagpur-Hyderabad Highway right?
It's NH63(NH16). NIZAMABAD-JAGDALPUR HIGHWAY. 4 Laning and laying of large underground water pipes are going on along this road.
Let it be an ROB or RUB. What we want is the works to be completed asap.
Yeah!! That's what we all need....to complete this line asap and to be operational asap....
Thanks! Good that Nizamabad-Jagdalpur NH is 4 laned, but will still be incomplete. It stops at Arjungutta after Mancherial, then a boat ride across Pranahita. Then again land Sironcha (MH), then Indravathi river. Then Chhattisgarh. Central part of India but hardly any vehicle or people there!