Search Forum
Blog Entry# 2101655
Posted: Dec 23 2016 (14:35)
6 Responses
Last Response: Dec 23 2016 (17:02)
6 Responses
Last Response: Dec 23 2016 (17:02)
Dec 23 2016 (14:35) 12988/Ajmer - Sealdah SF Express (PT) | AF/Agra Fort (5 PFs)Pran22^~ 55381 blog posts
.@Agra Fort.
Clean PF 1.
The fatal gap & uneven Pf 2 at AF.
AF ADI was already placed on Pf 4 & Loco that pulled AII SDAH till AF was added to AF ADI.
Clean PF 1.
The fatal gap & uneven Pf 2 at AF.
AF ADI was already placed on Pf 4 & Loco that pulled AII SDAH till AF was added to AF ADI.
2 Posts
Dhaansu night time snaps... any idea about the track doubling and electrification status on the Agra Fort - Achnera - Bharatpur Route ? :)
Ncr is least interested in doubling.
They Are more keen on Electrification than on doubling till BKI.
They Are more keen on Electrification than on doubling till BKI.
A non-electrified double track route is comparatively more useful than a single track electrified route to eliminate congestion... something NCR and many other Zonal Railways may not accept due to Railway Board instructions :-p
Yes crossing agra yamuna bridge loco change takes lot of time . Tdl to BKI takes 3 hrs including loco change. So doubling plus Electrification is must in af to jp.