Search Forum
Blog Entry# 2101720
Posted: Dec 23 2016 (15:22)
7 Responses
Last Response: Jan 11 2017 (00:57)
7 Responses
Last Response: Jan 11 2017 (00:57)
#CRS Inspection of Bareilly city - Ramganga would be done soon.
2 Posts
I think trains are running on this track. RMR-BDTS exp ane BE-KSG passengers.
How can traim run in this track when work completed just now and crs not done
Trains are not running on old MG track. There is a jump over line from BE to IZN BG diesel loco shed. This line is being used as of now for connectivity between BV and BEM via BE. Existing BE RGB line is used to reach RGB and from there NER trains take routine route to BEM and KSJ.