Search Forum
Blog Entry# 2104962
Posted: Dec 26 2016 (00:48)
8 Responses
Last Response: Dec 27 2016 (17:53)
8 Responses
Last Response: Dec 27 2016 (17:53)
The real should be utilized properly..2 trip with 1 Rake possible... This is case with Hundreds of trains in India
3 Posts
MatbĂ l 3.5 hr running hai up DN me...baki time Rake ka koi use nahi ??
The corridor should have been longer at least up to Gwalior or extended to Gwalior with 140kmph speed limit.
It should be extended to CDG in both directions for better utilization.. and CDG shatabdi can be withdrawn in lieu of this extension