Search Forum
Blog Entry# 210742
Posted: Jul 27 2011 (09:06)
1 Responses
Last Response: Jul 27 2011 (09:11)
1 Responses
Last Response: Jul 27 2011 (09:11)
1. The average speed of the train should be increased to atleast 55km.2.Two 3ac coaches should be run in place of two 2ac coaches.3. no of halts should be reduced depending on the sale of tickets and alternative train availability.