Search Forum
Blog Entry# 2119162
Posted: Jan 07 2017 (17:24)
2 Responses
Last Response: Jan 07 2017 (21:14)
2 Responses
Last Response: Jan 07 2017 (21:14)
New Facilities/Technology
CR/Central
I.R.needrejuvenation~ 949 news posts
The proposed Mumbai-Ahmedabad bullet train will now have a longer route, with the Centre accepting the state government’s proposal to extend the high-speed corridor to Pune...
read more... BULLET TRAIN TO RACE TO PUNE AND NASHIK
Great News, Centre agrees to the proposal of Maha state Govt to extend the Bullet train corridor to Pune & Nashik.
.
MUM-ADI route should not be to go via Nashik,which will make it much longer and slower/difficult route. Nashik route should be separate and join/run parallel to ADI-MUM route at a suitable point.
.
Devendra...
more...
.
MUM-ADI route should not be to go via Nashik,which will make it much longer and slower/difficult route. Nashik route should be separate and join/run parallel to ADI-MUM route at a suitable point.
.
Devendra...
more...
The crowd travelling from Surat , Ahmedabad to Nashik, and Pune Nashik is huge, thus the laying of tracks between these cities will beneficial for people and Industries. The traffic on roads would decrease,as there is load on traffic in recent time.