IR Electrification plan
Source Ministry of Railways
Ongoing electrification and electrification to be taken up both shown by green and blue
Source Ministry of Railways
Ongoing electrification and electrification to be taken up both shown by green and blue
10 Public Posts - Mon Jan 23, 2017
Burhwal-Scc crs and approved in October not recently and freight are running right from the month of October
And this map is showing electrification of MFP-VKNR which is nor proposed by ECR neither sanctioned by RB while GKP-VKNR which has been taken up by CORE Is missing
And this map is showing electrification of MFP-VKNR which is nor proposed by ECR neither sanctioned by RB while GKP-VKNR which has been taken up by CORE Is missing