Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

NCR - maar bhi, raftaar bhi - Harshit Sharma

Search Forum
<<prev entry    next entry>>
Blog Entry# 2146147
Posted: Jan 30 2017 (21:12)

14 Responses
Last Response: Jan 31 2017 (17:12)
Rail News
9567 views
0

Other News
Jan 30 2017 (18:25)   भारत में चलेगी ये ख़ास टैल्गो ट्रेन, दिल्ली-मुंबई पहुंचे 12 घंटे में

Jayashree^   51416 news posts
Entry# 2146147   News Entry# 292599         Tags   Past Edits
रेल राज्य मंत्री मनोज सिन्हा ने सोमवार को कहा कि भारत की जरूरतों के अनुसार टैल्गो ट्रेनों में स्लीपर बर्थ लगाकर इन्हें चलाया जाएगा। 2016 में...

10 Public Posts - Mon Jan 30, 2017

4582 views
0

Jan 31 2017 (14:29)
TheMadrasMail~
TheMadrasMail~   6349 blog posts
Re# 2146147-12              
The weight of the passengers is a very small part of the whole coach's weight itself, so increasing the capacity of the coach by changing the internal layout doesn't make a big difference for the coach's weight and speed potential as a whole. Each coach weighs less than half the weight of a standard LHB coach, and is a little over half the length of an LHB coach. The decrease in capacity per coach, can be compensated with more number of coaches. There will be some reduction compared to a standard rake, but the difference will be compensated by the reduction in operating costs and higher speed potential.
Also Talgo's higher speed capacity is primarily due to the
...
more...
shorter coaches, less ground clearance and vestibule design for zero air gap between coaches. All these reasons mean that even with longer rakes, the coaches will still retain a higher speed limit than the LHB coaches on similar track conditions.
The most attractive feature however, is the ability to use all these advantages while spending very less on track upgrades. Signalling upgrades will still have to be made, but usually, the track upgrades and related construction activities are the ones that end up taking several years in our country. Talgo can be quickly brought to service as they are pretty much capable of meeting higher speeds on our existing tracks. If IR doesn't screw it up ( due to politics or whatever), this will be a good bargain for our system.

Translate to English
Translate to Hindi

3 Public Posts - Tue Jan 31, 2017
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy