Search Forum
Blog Entry# 2148869
Posted: Feb 02 2017 (12:54)
10 Responses
Last Response: Feb 18 2017 (17:16)
10 Responses
Last Response: Feb 18 2017 (17:16)
Feb 02 2017 (12:54) 22109X/Mumbai LTT - Hazrat Nizamuddin AC SF Express
OvaisKhan_2011~
OvaisKhan_2011~ 135 blog posts22109 LTT NZM AC Exp. should be made to run from CSTM.
Also this train should be made to run 1 to 1.5 hr later than scheduled departure of 14.30 to 15.30 or 15.45 from CSTM.
So that frequency of this train can be increased biweekly or triweekly that's why the time slot should be changed for this train.
The duration of halt...
more...
Also this train should be made to run 1 to 1.5 hr later than scheduled departure of 14.30 to 15.30 or 15.45 from CSTM.
So that frequency of this train can be increased biweekly or triweekly that's why the time slot should be changed for this train.
The duration of halt...
more...
2 Public Posts - Thu Feb 02, 2017
1. Extension to CSTM is operationally not feasible at present due to its RSA and also maintenance
2. Postponing Time slot is not feasible as the time available for secindary at NZM will be reduced. Instead upto BPL there can be a slack cut of say 15 mins making it arrive NZM at 10:10 hrs which will give scope for increasing the service to Triweekly provided one more rake is added. It cant run Triweekly under current set up due to RSA
...
more...
2. Postponing Time slot is not feasible as the time available for secindary at NZM will be reduced. Instead upto BPL there can be a slack cut of say 15 mins making it arrive NZM at 10:10 hrs which will give scope for increasing the service to Triweekly provided one more rake is added. It cant run Triweekly under current set up due to RSA
...
more...
3 Public Posts - Fri Feb 03, 2017
1 Public Posts - Mon Feb 06, 2017
1 Public Posts - Tue Feb 14, 2017
2 Public Posts - Sat Feb 18, 2017