Search Forum
Blog Entry# 2158326
Posted: Feb 10 2017 (07:48)
29 Responses
Last Response: Mar 14 2017 (10:07)
29 Responses
Last Response: Mar 14 2017 (10:07)
13 Public Posts - Fri Feb 10, 2017
main Bottle neck is at Visakhapatnam Outer. GPT to VSKP outer track fit for 80 kmph.
At GPT where HWH,MAS line connected at that connection MPS 30 kmph. If these two eliminated then Huge tome can be saved.
Railways has enough place to lay another 2-3 tracks here but neglected
At GPT where HWH,MAS line connected at that connection MPS 30 kmph. If these two eliminated then Huge tome can be saved.
Railways has enough place to lay another 2-3 tracks here but neglected
3 Public Posts - Fri Feb 10, 2017
1 Public Posts - Tue Feb 14, 2017
4 Public Posts - Sat Feb 25, 2017
3 Public Posts - Sun Feb 26, 2017
1 Public Posts - Mon Mar 13, 2017
1 Public Posts - Tue Mar 14, 2017