Search Forum
Blog Entry# 2242757
Posted: Apr 20 2017 (09:51)
47 Responses
Last Response: Apr 21 2017 (12:35)
47 Responses
Last Response: Apr 21 2017 (12:35)
Apr 20 2017 (09:51) IS 09042/Ghazipur City - Bandra Terminus Inaugural Special | GCT/Ghazipur City (5 PFs)
brucewayne~
brucewayne~ 2901 blog postsNR LHB rakes
Front EOG NCR
GD Groom ready with the bride for departure from PF-1 which departed at 11:45 delayed by MoSR itself due to inaugration of Escalators and other ameneties.
Due to this delay the front road crossing was closed for 45 mins. and 6 trains were looped due to this... at BSB,BCY,KMDR and Yusufpur.😂😂😂😂😂😂😂
Do...
more...
Front EOG NCR
GD Groom ready with the bride for departure from PF-1 which departed at 11:45 delayed by MoSR itself due to inaugration of Escalators and other ameneties.
Due to this delay the front road crossing was closed for 45 mins. and 6 trains were looped due to this... at BSB,BCY,KMDR and Yusufpur.😂😂😂😂😂😂😂
Do...
more...
39 Public Posts - Thu Apr 20, 2017
iske chakkar me meri band bajne wali h kal.... bunking in student life is good not in professional life thats what i did today just to capture it.....
anyways its a part of me 🙌linguistically
anyways its a part of me 🙌linguistically
6 Public Posts - Thu Apr 20, 2017
1 Public Posts - Fri Apr 21, 2017