Search Forum
Blog Entry# 2287628
Posted: May 22 2017 (14:17)
7 Responses
Last Response: May 22 2017 (16:01)
7 Responses
Last Response: May 22 2017 (16:01)
Commentary/Human Interest
ML/Mumbai Local
Rang De Basanti^ 138872 news posts
In a nationwide cleanliness survey of 407 railway stations, 75 of them major ones, Mumbai has had a dirt-poor showing. Not only does no station from...
2 Posts
Station renovation & cleanest work dadar station is going in slow pace. because dadar is most overcrowded station.
Mumbai's only conjuncture point of western and central line is dirtiest so sad to hear Dadar must be prioritised it is busiest,crowdest even top earning station of Mumbai suburbs
* There is lack of space at this crucial station, which is suburban station of WR as well as CR and terminus/stopping station of CR long distance trains.
* Solution to the problem is to have more tracks and platforms either Underground or Elevated. Since not much has progressed in the elevated front, the hope belies on underground option.
* May be things will improve in this respect once metro corridors under construction in Mumbai are commissioned.
* Solution to the problem is to have more tracks and platforms either Underground or Elevated. Since not much has progressed in the elevated front, the hope belies on underground option.
* May be things will improve in this respect once metro corridors under construction in Mumbai are commissioned.
lak of space cannot be provided as reason for lack of cleanliness.
Metro corridor is most important it will big boon for dadar & rest of Mumbai all overcrowded areas. But metro corridors work take 5 to 7 years to completion.
And 5th & 6th lines Kurla-CSTM also 6th line Borivali to Mumbai Central will reduce some overcrowded load.
And 5th & 6th lines Kurla-CSTM also 6th line Borivali to Mumbai Central will reduce some overcrowded load.