22626 SBC-MAS Double Decker - எப்பவுமே டாப் டக்கர் - Vijay Baradwaj

Search Forum
<<prev entry    next entry>>
Blog Entry# 2306424
Posted: Jun 04 2017 (02:23)

2 Responses
Last Response: Jun 04 2017 (16:31)
Poll
7300 views
18 votes
0

Jun 04 2017 (02:23)  
ForIndiaBlog
ForIndiaBlog   103 blog posts
Entry# 2306424              
प्रत्येक किलोमीटर पर होने वाले पैसों के खर्च के नजरिये से कौन ज्यादा महंगा है अथवा होगा ?
Translate to English
Translate to Hindi
NO vote
मेट्रो ट्रेन चलाना? या
17%
3
बुलेट ट्रेन चलाना?
83%
15

5238 views
0

Jun 04 2017 (10:27)
ForIndiaBlog   103 blog posts
Re# 2306424-1               Past Edits
Cost of Chennai first phase Metro for 54KM. is Rs.
20,000 crore. So per km =Rs.370.37
.
Estimated cost for Bullet Train for 508 KM is Rs.79,087crore.so per KM cost =155.68 crore.
.
If
...
more...
add 20% increase during construction .
Now Total 155.68+31.13= Rs.186.81 crore
.
Final
Per KM Metro. =370.37 cr
Bullet Train /km= 186.81 cr.
.
Please verify and Reply.
.
Source Links
Chennai Metro 1st
Mumbai Ahmedabad Bullet Train

Translate to English
Translate to Hindi

3292 views
0

Jun 04 2017 (16:31)
A2Z~
A2Z~   17505 blog posts
Re# 2306424-2              
* Dear friend your question practically have many "ifs & Buts' and does not have a clearcut answer.
* Actual cost per KM vary from case to case depending on the fact that whether the track is over the ground (cheapest), Elevated (costly) or Underground (costliest). Land acquisition cost is also a big factor especially in the city area.
* Terrain make a very big difference in cost, plains are cheapest, Undulating Plateau costly, Hills/valleys are costliest (especially in case of HSTs.)
*
...
more...
Metro is constructed in large cities which are usually located on plains/plateau and rarely on hills
* Metro is normally underground or elevated where as Bullet (HST) train is normally overground or elevated.
* Hence for different hypothetical conditions, we can say that
(1) HST on hilly track should be costlier than elevated metro
(2) Underground metro should be costlier than over ground/elevated bullet train
(3) HST on Hilly track vs. Underground Metro is a tug-of-war mainly dependent on the toughness of hilly terrain. HST in Kashmir valley shall be costlier than under ground metro, for simpler hills the HAT may be cheaper.
(4) Overground HST should be cheaper than elevated Metro
(5) Elevated HST should be slightly costlier than elevated Metro
* Original HST plan and studies/surveys were conducted for ADI-Mumbai-Pune route, but Mumbai-Pune stretch was dropped because of higher construction cost required for hilly terrain between Mumbai & Pune.

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy