Search Forum
Blog Entry# 2322986
Posted: Jun 16 2017 (18:07)
1 Responses
Last Response: Jun 16 2017 (18:07)
1 Responses
Last Response: Jun 16 2017 (18:07)
Other News
Jayashree^ 51391 news posts
LUCKNOW: The congestion problem on Varanasi-Lucknow route is likely to end by October end, said member, traffic, Railway Board, Mohammad Jamshed. Talking to TOI, he said...
So once the Chandrauli - Adheenpur Route Length of 58.66 km is doubled (and electrified too) then the entire route may become fit to speed up LHB trains like Durgiana Express. If the MPS becomes something between 115 to 120 Kmph then the travel time between BSB and LKO via SLN should come down to 4.5 to 5 Hours. Right? :) #TrackReforms