Electrification update of MLDT-NJP section....current progress update
Electrification work reached upto Up distance signal of NJP....Up line mai pole install ho gaya bridge tak and single wire bhi lag gaya.....
Down line mai bhi pole bridge tak chala gaya
Hope work complete soon within 1.5 year maximum
Electrification work reached upto Up distance signal of NJP....Up line mai pole install ho gaya bridge tak and single wire bhi lag gaya.....
Down line mai bhi pole bridge tak chala gaya
Hope work complete soon within 1.5 year maximum
2 Public Posts - Sat Jun 17, 2017
3 Public Posts - Sun Jun 18, 2017
Matlab BJP aane se kaam speed up Hua hai..
Kuch v ho par pehle PKR-MLDT ka electrification main hai par iska progress bahut kharab hai. Mera point hai koi v main station par kaam start nai hua jaise NFK/MLDT/NJP aur ye sab station ko electrification karke train chalana 2020 ke pehle to possible nai hai.
Aur KIR-NJP ka v wahi time lag sakta at least 31st March 2020.
Kuch v ho par pehle PKR-MLDT ka electrification main hai par iska progress bahut kharab hai. Mera point hai koi v main station par kaam start nai hua jaise NFK/MLDT/NJP aur ye sab station ko electrification karke train chalana 2020 ke pehle to possible nai hai.
Aur KIR-NJP ka v wahi time lag sakta at least 31st March 2020.