Status of Harbour Line Extention till Goregaon:-
1.Tracks Laying Completed
2.Electrification of Andheri-Ram Mandir Section Remaining
3.Extention of Harbour Line Platform of Ram Mandir Station for 12 Car Local is going on
1.Tracks Laying Completed
2.Electrification of Andheri-Ram Mandir Section Remaining
3.Extention of Harbour Line Platform of Ram Mandir Station for 12 Car Local is going on
2 Posts
The Survey was Done to Connect Churchgate-Virar Line to CST-Kalyan Line Near Parel Which was Suggested by Bombay HC But Due to Switch Problems The Survey Report Came Negative
rmar is newly constructed, so why extension?
it must already be able to accommodate 12 coach?
and is the line going till malad?
tracks are also seen till malad after goregaon for a long disran
it must already be able to accommodate 12 coach?
and is the line going till malad?
tracks are also seen till malad after goregaon for a long disran
RMAR Harbour Line PFs were Earlier Constructed to Accommodate 9 Car Locals But Now PFs Extension is in Progress to Accommodate 12 Car Local and the Line is Going till Goregaon East-West Flyover These Lines will Be Used to Park Local Trains
there was also news of teh fifth line to be used for adh bvi locals in morng eve hrs, any update?