Search Forum
Blog Entry# 2387519
Posted: Aug 22 2017 (16:25)
1 Responses
Last Response: Aug 22 2017 (16:25)
1 Responses
Last Response: Aug 22 2017 (16:25)
Major Accidents/Disruptions
12723_AP_12724^~ 6097 news posts
खतौली में हुए कलिंग उत्कल एक्सप्रेस हादसे की गाज रेलवे बोर्ड अधिकारियों से लेकर सेक्शन इंजीनियरों तक भले ही गिर गई हो, लेकिन अभी भी मामले...
* Starting the repair work before getting block is an indication of poor regard to mandatory safety protocols. Very high traffic lead to saturation of tracks and getting block on such track for repair/maintenance become very difficult.
* The Rly staff get block for lesser than the required time leading to hurry and bypassing of safety protocols. The current accident appears to be a product of such situation.
* Underinvestment in IR over several decades have resulted in much lesser than the required capacity augmentation and the saturation of the tracks....
more...
* The Rly staff get block for lesser than the required time leading to hurry and bypassing of safety protocols. The current accident appears to be a product of such situation.
* Underinvestment in IR over several decades have resulted in much lesser than the required capacity augmentation and the saturation of the tracks....
more...