Search Forum
Blog Entry# 2396144
Posted: Sep 01 2017 (10:21)
15 Responses
Last Response: Sep 02 2017 (00:53)
15 Responses
Last Response: Sep 02 2017 (00:53)
Sep 01 2017 (10:21) DHQ/Dharakhoh (3 PFs) | AJNI/WAG-7/27288
HimalayanRailways^~
HimalayanRailways^~ 14283 blog posts>>>>~>>धाराखोह <<~<<<<
A place where additional power provided to locomotives to climb over the Ghats ...
Covered with Dense forest & scenery .
Some shots clicked on 4/08/2017 to show the beauty of this section ..
Hope...
more...
A place where additional power provided to locomotives to climb over the Ghats ...
Covered with Dense forest & scenery .
Some shots clicked on 4/08/2017 to show the beauty of this section ..
Hope...
more...
10 Posts
Tripling work is sanctioned.... For Ghats the third line will not be laid alongside the existing lines, they will change the alignment so that tunnels are avoided
I knw that triplling work has been sanctioned bt here at DHQ that work was not for tripling ...
Only old lines were replaced by new
Only old lines were replaced by new