Search Forum
Blog Entry# 3030482
Posted: Jan 23 2018 (12:04)
22 Responses
Last Response: Jan 26 2018 (10:58)
22 Responses
Last Response: Jan 26 2018 (10:58)
Jan 23 2018 (12:04) 13046/Mayurakshi Express | DGR/Durgapur (5 PFs) | HWH/WAP-7/30327
Shoubhik~
Shoubhik~ 9299 blog postsA PASSENGER WITH SUPERFAST PRIORITY
Had a short trip in Mayurakshi fast passenger upto Durgapur some days ago. And as usual it enjoyed very high priority in Howrah-Asansol Mainline. It even overtook some long distance trains like New Jalpaiguri - Chennai Superfast exp and Mithila Exp enroute
Pic...
more...
Had a short trip in Mayurakshi fast passenger upto Durgapur some days ago. And as usual it enjoyed very high priority in Howrah-Asansol Mainline. It even overtook some long distance trains like New Jalpaiguri - Chennai Superfast exp and Mithila Exp enroute
Pic...
more...
18 Posts
speeding up this train by 25 mins will take its avg speed 2 51 kmph. ER should make it a Express with removing halts some halts
RPH dep 05.50; HWH arr 11.30; HWH dep 16.25; RPH 22.05 for 53045. 289 kms in 5 hrs 40 mins @ 51 kph.
53045 must be renumbered as 13045 & 53046 must be renumbered as 13046 & converted to M/E
RPH dep 05.50; HWH arr 11.30; HWH dep 16.25; RPH 22.05 for 53045. 289 kms in 5 hrs 40 mins @ 51 kph.
53045 must be renumbered as 13045 & 53046 must be renumbered as 13046 & converted to M/E
Upgradation is absolutely unnecessary for this train and for Viswabharati fast pass IMO. Just decreasing the journey time by 20-25mins so that the train reaches the destination by 20-25mins late and then increasing the fare for that is not needed for this train. Let some cheap source of travelling also exist in IR with trains trains like mayurakshi
Also halt removal is not possible. It halts almosts at the main stations only enroute
Also halt removal is not possible. It halts almosts at the main stations only enroute
Hmm. Ami kalkeo dekhlam P7 link diyeche train take. Ota ki ekhon regular link hoye geche?