Search Forum
Blog Entry# 3094677
Posted: Feb 11 2018 (15:11)
11 Responses
Last Response: Feb 15 2018 (23:56)
11 Responses
Last Response: Feb 15 2018 (23:56)
Feb 11 2018 (15:11) 18047/Shalimar - Vasco-da-Gama Amaravati Express (PT)
ForeverRailfan^~
ForeverRailfan^~ 53269 blog posts6 Posts
you mean there is no sleeper in KCG-GTL slip ??? or no general in slip ?
Sleeper 1
3AC 1
2AC 1
SLR 1
??
Sleeper 1
3AC 1
2AC 1
SLR 1
??
SWR is exceptional that they reduced limit of trains in Braganza Ghats from 22 to 20 as a result two coaches have to be detached so that CC remains 20 in Ghats. In future you never know when the 20 limit will get down to even low.
Instead of detaching at GTL, they could've detached at UBL will be more useful for passengers from BAY, HPT towards UBL.
Nope it's easier as HWH GTL portion is to be detached and KCG VSG is attached. For all this mess SWR is solely responsible.