Feb 12 2018 (17:42) IMG16074-1746701/♥♥Hubballi-Madurai Superfast Express(Via-Guntakal,KSR Bengaluru,Tirupattur)♥♥
1944 net green flags 3 green per TrainCustom Ratings
TamilpesumINDIAN~
TamilpesumINDIAN~ 610 img trains 153 popular1944 net green flags 3 green per TrainCustom Ratings
Presenting a daily connectivity between Hubballi and Madurai via GTL,SBC. :)
1 Posts
The same Suggestions applicable for Return Journey of this train..
1.Even though time is wasted money is saved on fuel bro. Now the main mistake done by SWR is running D Locos in places where E Locos can be run. To avoid that i have made LC @Guntakal.
2.To make it beneficiary for the people of Gooty this train runs via Gooty.
3.As the line is single from Hubballi till Gadag and crossing of trains this train runs at Express speed instead of SF.
Tq...
more...
2.To make it beneficiary for the people of Gooty this train runs via Gooty.
3.As the line is single from Hubballi till Gadag and crossing of trains this train runs at Express speed instead of SF.
Tq...
more...
Regarding point no 1 and 2 it's optional as you are creator you can run as you lIke. .
Regarding Point no 3
Who said you line between Hubli to Gadag is single ? Have you travelled in recent I mean before an year you take.. total 17 km from Hubli to Hebsur is double Line.
And you train running express speed in...
more...
Regarding Point no 3
Who said you line between Hubli to Gadag is single ? Have you travelled in recent I mean before an year you take.. total 17 km from Hubli to Hebsur is double Line.
And you train running express speed in...
more...
But wht abt Hebsur to Gadag and Kanginha to Harlapur and Ginigera to Hosapete bro? They are under construction of doubling. So only speed has been reduced bro. Hope you understood now. :)
Ha ha Those also doubled need Linking of lines and S&T works going on for the finished Stretches But i ask you Stretch between Hospet-GTL which is already Doubled decade back if i need to Talk on single line sections from UBL-HPT i will be not throwing quetion of speed between HPT-GTL..