Search Forum
Blog Entry# 3254737
Posted: Mar 31 2018 (09:33)
3 Responses
Last Response: Mar 31 2018 (17:55)
3 Responses
Last Response: Mar 31 2018 (17:55)
Commentary/Human Interest
SWR/South Western
karbang~ 1745 news posts
Work on a foot overbridge connecting Krantivira Sangolli Rayanna (Bengaluru City) railway station's Platform Number 10 with the city railway metro station is in the final...
Which metro station are they speaking is it majestic or city railway metro station?
I think city railway metro station is already connected by escalator at pf-10 side so they are planning to connect pf-10 majestic(naraprabhu Kempegowda metro station) beside bus stand which is around 450mts away
I think city railway metro station is already connected by escalator at pf-10 side so they are planning to connect pf-10 majestic(naraprabhu Kempegowda metro station) beside bus stand which is around 450mts away
This is the connection between City Railway Station (Metro Purple Line) with PF-10 of the KSR Railway Station. The existing FOB there connected the Metro station to Old Mysore Road. They are extending it on the other side to PF-10.
The Kempegowda Majestic Interchange Metro Station is already connected to the subway that connects the BMTC and KSRTC bus stands to the railway station. I don't think there is any work going on there. This connection is 450m long.
Basically, if you need to go to the platforms 1-4 in KSR, it is...
more...
The Kempegowda Majestic Interchange Metro Station is already connected to the subway that connects the BMTC and KSRTC bus stands to the railway station. I don't think there is any work going on there. This connection is 450m long.
Basically, if you need to go to the platforms 1-4 in KSR, it is...
more...