Search Forum
Blog Entry# 327340
Posted: Jan 14 2012 (16:08)
8 Responses
Last Response: Jan 14 2012 (17:48)
8 Responses
Last Response: Jan 14 2012 (17:48)
Cost of Periodic Overhaul(POH)of one coach every 12 months.
It costs the Indian Railways about 3-4 lakh Rupees for POH of each coach.
In a POH, the broken parts are repaired, light bulbs/tubes replaced, torn seats replaced, suspension overhauled, batteries replaced, wiring repaired if needed, additional charging plug points provided and the coach is repainted.
It costs the Indian Railways about 3-4 lakh Rupees for POH of each coach.
In a POH, the broken parts are repaired, light bulbs/tubes replaced, torn seats replaced, suspension overhauled, batteries replaced, wiring repaired if needed, additional charging plug points provided and the coach is repainted.
1 Public Posts - Sat Jan 14, 2012
6 Public Posts - Sat Jan 14, 2012