Search Forum
Blog Entry# 3335199
Posted: Apr 23 2018 (10:12)
No Responses Yet
No Responses Yet
Apr 23 2018 (10:12) TVR/Thiruvarur Junction (5 PFs)
Ramaneswaran Baskaran~
Ramaneswaran Baskaran~ 284 blog posts*TPJ - KIK Electrification Update*
In TVR Jn West side Ballast are outed in Tracks by Workers...
Engineerers Surveyed for Bridge Problem.I think This tracks mounted like as Tunnel because Bridge is Very Low in this Height.
➡Last Two Pic's - Tress were cutting Out of Half for Electrification.
In TVR Jn West side Ballast are outed in Tracks by Workers...
Engineerers Surveyed for Bridge Problem.I think This tracks mounted like as Tunnel because Bridge is Very Low in this Height.
➡Last Two Pic's - Tress were cutting Out of Half for Electrification.