NHSRCL has kept target till August 22 . That the country's 1st Bullet train will come on tracks.
The ambitious project will Be commissioned
The ambitious project will Be commissioned
NO vote
Yes. Till 2022 it would commissioned
21%
3
No. it will go ahead of 2022 for commissioning of this prohect.
79%
11
3 Posts
That will require huge time.
And funds of course.
Perhaps never possible by 2022, perhaps not even possible by 2030.
And funds of course.
Perhaps never possible by 2022, perhaps not even possible by 2030.
Its first big project by IR with foreign collaboration at bigger level
As per the current work they are doing in rapid manner
They already acqutise land and more process is going on for land as fund is provided
Also 81% fund from JICA that will definitely hit it hard and to start construction late 2018 in my opinion but as per info they...
more...
As per the current work they are doing in rapid manner
They already acqutise land and more process is going on for land as fund is provided
Also 81% fund from JICA that will definitely hit it hard and to start construction late 2018 in my opinion but as per info they...
more...
(1) Land acquisition recently started but reportedly going at brisk pace. Litigations may follow as it is reported that Farmers esp. in diva area are protesting against land acquisition. This is a weak link.
(2) Design drawing etc work is in advanced state
(3) soil testing etc work also in advanced stage in
(4) Funds shall not be a problem, as 81% shall come...
more...
(2) Design drawing etc work is in advanced state
(3) soil testing etc work also in advanced stage in
(4) Funds shall not be a problem, as 81% shall come...
more...