Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

NZM-Kota Jan Shatabdi: एवरेज स्पीड में नंबर वन, जिसमें नहीं है सवारियों का टोटा, यह है आपणी जनशताब्दी From कोटा - Madan Mohan Meena

Search Forum
<<prev entry    next entry>>
Blog Entry# 3430539
Posted: May 18 2018 (22:01)

21 Responses
Last Response: May 21 2018 (18:52)
Rail Fanning
77687 views
32

★★★
May 18 2018 (22:01)   16592/Hampi Express | KBL/Koppal (3 PFs)
SingleTraveller^~
SingleTraveller^~   3249 blog posts
Entry# 3430539            Tags   Past Edits
1 compliments
Thanks
Ballari - Hosapete - Koppal - Gadag section --- Railfanning and info update.
-
1. Pics 3 - 7 : Ballari station.
- The old building has been demolished and some work is going on.
-
...
more...
Old remnant of the steam engine era - water filling pipe.
-
2. Pics 8 - 13 : Some LHB train passed. It had Deen Dayalu, Antyodaya and AC coaches.
-
3. Pics 14 - 30 : Till HPT
- Industries, Power Plant, lot of freights.
- Electrification poles have been erected from KDN to a few Kms after DAJ - no progress from the last time I saw.
-
4. Pics 31 - 44: Hosapete.
- HPT to KBL the track has been laid, even over Tungabhadra river bridge. But still track linking and signalling is left. Similar to RDI-ASK line, where they are taking ages to complete the work even though the main track laying is complete.
- There is a sleeper manufacturing factory after HPT, there too some track issue I guess as the track is very close to the compound.
- The new personnel resting room can be seen in one pic.
- The line to KTY deviates immediately after the PF. Sugarcane field is next to it and then the line from KTY towards KBL joins.
-
5. Pics 45 - 51 : Munirabad and Hitnal.
- Hitnal has no PF, it is located just before the NH connecting Hosapete and Vijayapura.
-
Will continue in reply posts. Problem in uploading pics.
-

Translate to English
Translate to Hindi

2 Public Posts - Fri May 18, 2018

8647 views
12

★★
May 18 2018 (23:00)
SingleTraveller^~
SingleTraveller^~   3249 blog posts
Re# 3430539-3              
Simply unable to post more pics. From 5 pm trying to post all the pics. Each time error.
I used to upload all the pics in a single blogpost. But today struggling. So will post each station now.
-
6. Pics 1 - 14 : Ginigera.
-
...
more...
Two lines from some industry is being laid on the left.
- One existing line from another industry, along with line from Gangavathi joins at Ginigera on the right.
- One more line is the new double line.
- New PF is being constructed.
- TPTY pass crossing.
-
7. Pics: 15 - 21 : Koppal.
- The flyover work has stopped.
- The island PF commisioned last year with saplings planted.
- The completed double line starts from here.
-

Translate to English
Translate to Hindi

3 Public Posts - Fri May 18, 2018

11 Public Posts - Sat May 19, 2018

4 Public Posts - Mon May 21, 2018
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy