Let's discuss about some new railway line proposals!!
Route cost appr. at ₹20 crores/km.
1) Bobbili Junction - Srikakulam Road via Razam. ₹1920 crores.
2) Vizianagaram Junction - Visakhapatnam Junction via Madhurawada, Gambhiram, Anandapuram (Fly Over Line through Visakhapatnam till Gambhiram.). ₹2240 crores, doubled as it is an elevated corridor.
3)...
more...
Route cost appr. at ₹20 crores/km.
1) Bobbili Junction - Srikakulam Road via Razam. ₹1920 crores.
2) Vizianagaram Junction - Visakhapatnam Junction via Madhurawada, Gambhiram, Anandapuram (Fly Over Line through Visakhapatnam till Gambhiram.). ₹2240 crores, doubled as it is an elevated corridor.
3)...
more...
10 Posts
No. 2 ayye pani kaadhu sir. Normal gaane elevated, electrified track (for Metro) ki cities lo almost 250 crores per km avutundhi. Adey main line trains (locomotive hauled trains) ki aithe, daniki atleast 1.5 times avutundhi.
And Vizag antha hilly region, so track lo gradients lekunda mainline trains velletattu kattalante just within the city line ke easy ga 5000 crores paina avutundhi.
Antha chesaka trains speed takkuva untundhi (heavy main line trains flyovers meedha speed ga vellalante chaala invest cheyyali), plus goods trains...
more...
And Vizag antha hilly region, so track lo gradients lekunda mainline trains velletattu kattalante just within the city line ke easy ga 5000 crores paina avutundhi.
Antha chesaka trains speed takkuva untundhi (heavy main line trains flyovers meedha speed ga vellalante chaala invest cheyyali), plus goods trains...
more...
Ok.. kani North - South corridor lo VSKP lanti station.. ila o pakkaki undatam pedda ibbandi ane cheppali.. Port Area bulb line annaru.. emaindi??
Reversal avoid cheyyalante aa Bulb line okkate daari. Appatlo Navy vaadu permission ivvaledhu annaru. But aa proposal ni ECoR kuda serious ga teesukoledhu anukunta.
Goods anni Marripalem, SCMN, port yards ki velthayi kabatti, vatiki Bulb line avasaram ledhu. Only passenger trains ki maatrame upayogam. Probably Gopalapatnam-VSKP ni tripling cheyyadam easy anukunnaru.
Goods anni Marripalem, SCMN, port yards ki velthayi kabatti, vatiki Bulb line avasaram ledhu. Only passenger trains ki maatrame upayogam. Probably Gopalapatnam-VSKP ni tripling cheyyadam easy anukunnaru.