Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Kolkata Local - আমি তোমাকে ভালবাসি

Search Forum
<<prev entry    next entry>>
Blog Entry# 3715671
Posted: Aug 15 2018 (18:26)

2 Responses
Last Response: Aug 15 2018 (19:30)
General Travel
2447 views
7

Aug 15 2018 (18:26)  
susmits~
susmits~   337 blog posts
Entry# 3715671              
Udaipur - Chittaurgarh Electrification Progress Report (with pics). Official target March 2019.

1. No work at all between Chittaurgarh and Chanderiya, or Chittaurgarh and Berach Jn Cabin. I haven't traveled on the Chanderiya - Berach Jn Cabin bypass, but I'm not hopeful.

1.
...
more...
Wiring done between Berach Jn Cabin and about halfway to Ghosunda, but in a way that's somewhat loose. See pics 1 and 2.

2. Around Ghosunda, wiring becomes more of the tense sort we are used to seeing. See pics 3 and 4.

3. There is a traction substation being raised just outside Ghosunda. See pic 5.

4. The finished sort of wiring continues all the way to Kapasan. See pic 6.

5. Happily, the depot at Kapasan is almost depleted. See pics 7 and 8, which also includes a loaded wagon with Cu-Cd wires ready to be strung.

6. Between Kapasan and Bhupal Sagar, there are no wires, but wire supports have been attached. See pic 9. Stands to reason that this will be wired next.

7. Between Fatehnagar and Mavli, there are poles but no wire supports. Poles also vanish in the 500m region surrounding Mavli. See pics 10 and 11.

8. About 3 km after Mavli, poles give way to cemented foundations. See pic 12. These continue till about 2 km after Khemli, and stop totally as the terrain roughens up. However, Debari station has some cemented foundations.

Translate to English
Translate to Hindi

999 views
1

Aug 15 2018 (18:30)
Lakecity~
Lakecity~   2310 blog posts
Re# 3715671-1              
Thnx bhai update k lia..Kam achi speed m chl rha h
Translate to English
Translate to Hindi

1009 views
0

Aug 15 2018 (19:30)
Love114~
Love114~   1571 blog posts
Re# 3715671-2              
thanks for update !
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy