Search Forum
Blog Entry# 3850235
Posted: Sep 29 2018 (07:02)
48 Responses
Last Response: Sep 30 2018 (22:41)
48 Responses
Last Response: Sep 30 2018 (22:41)
Sep 29 2018 (07:02) 18426/Durg - Puri Express (PT) | BBS/Bhubaneswar (6 PFs) | BZA/WAP-4/22581
_V_K_^~
_V_K_^~ 63725 blog posts43 Posts
DP ki taiyaari kaiso chal rahi hai. I miss my old days..when we celebrate durga puja....
This newly upgraded loco is undergoing trials with Purushottam Express.
366 29-Sep-18 12802 Dir 166 ECoR KUR 30136 GZB WAP5 3-Phase DOC, GZB, Jun 9 2018 / IA, GZB, Sep 7 2018 Aux. converter IGBT (BUR) (NDLS-PURI/Load-24B), After starting Ex.Bhubaneswar (BBS) station, VCB tripped with "Dis.in processor BUR-3" followed by "Fetal error in main circuit". Put MCE off/on but not succeed. R/engine given. DOC-09.06.18, IA-07.09.18, Major/Sec-BBS-PURI, Minor/Sec-Bhubaneswar-Raetang (BBS-RTN), Time-05.10-07.40 hrs. Loco at PURI Station. IGBT loco, SR-BT, BUR-AAL. 0 Loco
366 29-Sep-18 12802 Dir 166 ECoR KUR 30136 GZB WAP5 3-Phase DOC, GZB, Jun 9 2018 / IA, GZB, Sep 7 2018 Aux. converter IGBT (BUR) (NDLS-PURI/Load-24B), After starting Ex.Bhubaneswar (BBS) station, VCB tripped with "Dis.in processor BUR-3" followed by "Fetal error in main circuit". Put MCE off/on but not succeed. R/engine given. DOC-09.06.18, IA-07.09.18, Major/Sec-BBS-PURI, Minor/Sec-Bhubaneswar-Raetang (BBS-RTN), Time-05.10-07.40 hrs. Loco at PURI Station. IGBT loco, SR-BT, BUR-AAL. 0 Loco