Dec 13 2018 (11:13) 17612/Mumbai CSMT - Hazur Sahib Nanded Rajya Rani Express | AWB/Aurangabad (5 PFs)
akash1269
akash1269 112 blog postsUpdates on SCR GM Visit to Aurangabad Nanded Div
1. Manmad Parbhani doubling by 2022 if proposal accepted this year.
2. Electrification tenders for manmad - mudkhed - dhone floated already and closed by november end, construction work to start in a month from manmad side .
3. Mumbai - Manmad Rajyarani express to get 8 slip coaches from Nanded soon attached at manmad...
more...
1. Manmad Parbhani doubling by 2022 if proposal accepted this year.
2. Electrification tenders for manmad - mudkhed - dhone floated already and closed by november end, construction work to start in a month from manmad side .
3. Mumbai - Manmad Rajyarani express to get 8 slip coaches from Nanded soon attached at manmad...
more...
16 Posts
there are 3 lines connected to MMR MUE SC route... We cant simply demand every train to be ply on a single route... NED SRC, PAU PNBE both run via MUE ADB route and get good response between few sections... Doubling is a must on PBN MMR section otherwise it would be a nightmare for passengers to start the new trains...
1] Yes doubling is required and no one is objecting it,it is good.
2] No good response. Check the availability of 17610 PAU PNBE from NED to NGP. Available almost every week that too with PQWL and very less number of bogies. The train gets filled at Nagpur mostly.
3] 12767 NED SRC availability:
7/1/19: RAC 16
14/1/19:...
more...
2] No good response. Check the availability of 17610 PAU PNBE from NED to NGP. Available almost every week that too with PQWL and very less number of bogies. The train gets filled at Nagpur mostly.
3] 12767 NED SRC availability:
7/1/19: RAC 16
14/1/19:...
more...
Please add the number of people who travel between nanded and nagpur with a general ticket, also mention the revenue generated by the spot reservation receipts. Like I said the track between MMR MUE is almost saturated and it would be a foolish thing to start or extend any train from AWB unless doubling gets completed..
See I don't like to argue unnecessarily. . I respect your opinions. ...and facts ....rest nothing is in my hand....no point in fighting.
Excuse me... Neither i was fighting nor arguing... I'm just trying to tell u that doubling is essential before introducing or extending any new trains... Like u said u have ur opinion i have mine...