Search Forum
Blog Entry# 424541
Posted: May 14 2012 (00:15)
35 Responses
Last Response: Jun 02 2012 (20:22)
35 Responses
Last Response: Jun 02 2012 (20:22)
May 14 2012 (00:15) 12041/Howrah - New Jalpaiguri Shatabdi Express | NJP/New Jalpaiguri Junction (8 PFs)
MailguardSG25~
MailguardSG25~ 24054 blog postsTalks are already going on in this website about LHB-iasation of HWH RNC Shatabdi Exp & subsequently allotting the ICF Rake to HWH-NJP Proposed Shatabdi.I have two questions:-
(i)Will the Shatabdi Run full?I think not many people of the region,through which the Shatabdi is expected to run,can afford a Costly Ride of Shatabdi.
(ii)Is it really possible to Run a Shatabdi b/w 567 km within 16-17 Hrs including the Return trip,where it'll be hauled by a Diesel Engine & the route b/w NFK & SNT,has lot of Engineering Problems,Presently the fastest Darjeeling Mail...
more...
(i)Will the Shatabdi Run full?I think not many people of the region,through which the Shatabdi is expected to run,can afford a Costly Ride of Shatabdi.
(ii)Is it really possible to Run a Shatabdi b/w 567 km within 16-17 Hrs including the Return trip,where it'll be hauled by a Diesel Engine & the route b/w NFK & SNT,has lot of Engineering Problems,Presently the fastest Darjeeling Mail...
more...
30 Posts
If it day train,then it is excepted that Malda,Pakur,Rampurhar,Bolpur Bound passengers will mostly use it for fast service .so fill all ac coaches halt should be given minimum for consideration.
Reason being a lot of quota required for NJP-BWn and MLDT-SDAH. Those go v full too, so the combined WL is a lot, and may be U know or not, MLDT will always have good quota for most trains to N Bengal
Having halts at RPH and BHP will fill up a lot of AC seats till there, but beyond RPH and MLDT, it will be really empty.
Instead of Introducing Shatabdi THE KOAA-HDB Express should have been made to run daily ...change in timings little bit and give it LHB coaches....tha will be the Big solution