Search Forum
Blog Entry# 4256311
Posted: Mar 10 2019 (10:11)
3 Responses
Last Response: Jan 14 (08:40)
3 Responses
Last Response: Jan 14 (08:40)
Mar 10 2019 (10:11) 17236/Nagercoil - SMVT Bengaluru Express (PT)
Mahesh Narayan
Mahesh Narayan 465 blog postsToo late in reaching Bangalore. Tirunelveli to Bangalore takes almost 14 hrs. They should do something seriously to speed up in both directions.
This train speed should be increased in both Directions between Dindigul and Bangalore (SMVB).
Both trains taking more time to cross the Bangarpet Main line at Baiyappanahalli.
After diverting origin from SBC to SMVB, the problem occurs at both Direction.
Also...
more...
Both trains taking more time to cross the Bangarpet Main line at Baiyappanahalli.
After diverting origin from SBC to SMVB, the problem occurs at both Direction.
Also...
more...
Also all trains should be given equal importance irrespective of operating zone as this benefits all people.
All trains should be treated as IR in all zones instead of SR, SWR and SC.
All trains should be treated as IR in all zones instead of SR, SWR and SC.
Similarly so many questions regarding this train.
1. If it always reaches Hosur late by 30-40 minutes, why can't the departure time changed to compensate the late timings.
2. If the train after reaching Nagercoil, is being run as an intercity express, why can't it be directly run as SMVT to TVC via NCJ.
3.when...
more...
1. If it always reaches Hosur late by 30-40 minutes, why can't the departure time changed to compensate the late timings.
2. If the train after reaching Nagercoil, is being run as an intercity express, why can't it be directly run as SMVT to TVC via NCJ.
3.when...
more...