Electrification Update. MB-CH-BE-ALJN
Almost 80% work done at kundarkhi, all pole errected even wires got streached.
I think only Sub stations SSP'S for power supply are left with.
But no sign of Sbu power station SSP'S on whole section.
Almost 80% work done at kundarkhi, all pole errected even wires got streached.
I think only Sub stations SSP'S for power supply are left with.
But no sign of Sbu power station SSP'S on whole section.