1.MALB-WKR electrification has started. Poles have been installed. Spotted by me. The poles are high rise OHE. Please update the same.
2. Talked with officials on GIMB. Electrification is confirmed. And soon work would start on SIOB-VG section
Thanks.
1.MALB-WKR electrification has started. Poles have been installed. Spotted by me. The poles are high rise OHE. Please update the same.
2. Talked with officials on GIMB. Electrification is confirmed. And soon work would start on SIOB-VG section
Thanks.
32 Posts
SUNR RJT. Chamaraj ke baad no track laying signs when I last traveled.
Preparatory Work under progress for starting OHE wiring in Wankaner - Dahinsara - Maliya Miyana section