Mar 28 2019 (13:08) Atlas Track# 71.3577 Atlas - Track Type
Somanko
Somanko_ELST^~ 10284 Conf TLs 14 Void TLsRoute: 71 LAE/Lakholi - KRAR/Khariar Road: Construction - Electric-Line Doubling: 0 km/h
It was showing construction Doubling and Electrification. So I changed in that way.
Not full section, only Khariar Road - Komakhan and Belsonda - Lakholi are still under doubling...remaining section was showing as DOuble