5 Posts
इतने उतावले होने की जरूरत नहीं है मित्र। पेपर की बात है ये । हकीकत 4 साल में पूरे होंगे इसकी भी कोई गारंटी नहीं।
Towards Purnia electrification is already sanctioned
Electrification up to Madhepura done in fact
With this new project we can assume that section via Kosi Mega Bridge and up to Forbesgunj-NMA-SKI /SHC all going to be electrified soon.
Electrification up to Madhepura done in fact
With this new project we can assume that section via Kosi Mega Bridge and up to Forbesgunj-NMA-SKI /SHC all going to be electrified soon.
as per CORE, they will finish JYG-DBG-SPJ this year. Post that they should finish DBG-RXL-NKE also. with that hopefully by 2021 GKP-NKE-DBG-NMA-SHC-KIR route will be fully electrified also. also if KIR bypass gets developed like BJU bypass and DBG bypass can be done hopefully by then this route can have some hope. BTW i am still to hear if railway is planning any Y leg at Sarigarh or not. IF not done, that will become bottleneck for this section.
In CORE pink book, there is no mention of this section, so guess this news was fake.