Aug 02 2019 (21:10) DDS/Dudh Sagar (1 PFs) | UBL/WDG-4/12034
ArjunAnbalagan
ArjunAnbalagan 4627 blog posts1Pic) Amazing Doodhsagar waterfalls while Arrived UBL WDG-4 #12034 hauled by BOXN rake fright..!!!
2Pic) Route Curve Track Tower Goa...!!
2Pic) Route Curve Track Tower Goa...!!
6 Posts
They have not yet started doubling on this section as it is the most difficult section on the entire route consisting of tunnels and mountain slopes.
They plan to start work only after the remaining line sections are ready.
Rumour is that they may have to shut down this section entirely till the work is done. So the delay.
They plan to start work only after the remaining line sections are ready.
Rumour is that they may have to shut down this section entirely till the work is done. So the delay.
Kulem to Sonalium is little bit easy but after that it's awfully tough so yeah they might have to shut down traffic.
I agree. Shutting down this section will be a big loss to the revenue of SWR. This section is max used by Freight.
Heard that the alignment of the second line would be dffrnt from that of the existing line in the ghat section.